Commit Graph
7 Commits
Author SHA1 Message Date
Brad King 71a4f052ed Tests: Avoid running VS 16+ tests when using a pre-v140 toolset 2024-05-13 10:57:27 -04:00
Brad King 03c31b0395 Drop Visual Studio 9 2008 generator
This generator has been deprecated since CMake 3.27.  Remove it.
2024-05-08 10:37:34 -04:00
Sumit Bhardwaj 7219988b00 VS: Exclude ZERO_CHECK.proj from .sln for include_external_msproject
In `cmGlobalVisualStudio7Generator::WriteTargetsToSolution`, we skip
writing `ZERO_CHECK.proj` to solution file as the check in
`cmGlobalVisualStudioGenerator::IsInSolution` returns `false` for
`ZERO_CHECK`. However, we write ZERO_CHECK to ProjectDependencies for
external projects as there are no checks in
`cmGlobalVisualStudio71Generator::WriteExternalProject`.

Similar to `cmGlobalVisualStudioGenerator::IsInSolution`, we introduce
`IsDepInSolution(const std::string&)` which excludes `ZERO_CHECK.proj`
from being added to sln file for the cases where we have `ZERO_CHECK.proj`.

Fixes: #23708
2022-07-20 08:51:38 -04:00
Dario Passet c7aa3bdefc Tests/include_external_msproject: Check C# project reference 2021-05-13 18:38:01 +02:00
Joerg Bornemann ae1e1909a1 VS: Add support for .NET Standard and .NET Core
Fixes: #20105
2020-01-24 09:11:05 -05:00
Beeble 227de0b95d include_external_msproject: Honor MAP_IMPORTED_CONFIG_<CONFIG>
This allows projects added via `include_external_msproject` to compile
the preferred configuration despite different naming conventions.
2017-04-05 13:44:03 -04:00
Brad King 4a30258d91 include_external_msproject: Test TYPE, GUID, PLATFORM options (#13120)
Add "RunCMake.include_external_msproject" test to use the TYPE, GUID, and
PLATFORM options to include_external_msproject.  Since projects with
custom types and platforms cannot be loaded without special VS plugins
validate the results by directly parsing the generated solution (.sln).

Co-Author: Leonid Yurchenko <nocturne@qarea.com>
2012-04-19 08:35:55 -04:00