Commit Graph
24 Commits
Author SHA1 Message Date
Brad King 06178da668 VS: Add include_external_msproject detection of .wapproj type
It is a Windows Application Packaging Project.

Issue: #27392
2025-11-18 11:18:17 -05:00
Brad King b9ce07b85b VS: Add SLNX project types
Extend commit e6aa7742b0 (VS: Generate .slnx files for VS 2026,
2025-09-17, v4.2.0-rc1~151^2) to add the `Type=` attribute on SLNX
`<Project>` elements.

Fixes: #27392
2025-11-18 11:10:22 -05:00
Brad King 70ed720232 VS: Add SLNX default startup project
At the time of commit e6aa7742b0 (VS: Generate .slnx files for VS 2026,
2025-09-17, v4.2.0-rc1~151^2), the VS 18 Insiders edition did not offer
support for specifying a default startup project in `.slnx` files.
This has since been added, so use it.

Fixes: #27387
2025-11-14 11:03:57 -05:00
Brad King 7c284f4278 VS: Fix SLNX with multiple solution-to-project configuration mappings
Filter each mapping to apply only to its intended solution-wide config.

Fixes: #27385
2025-11-13 12:01:51 -05:00
Brad King 46b0202ce0 VS: Fix SLNX generation so CSharp projects build in the IDE
Add an explicit solution-level per-project `Platform` for `.csproj`
projects even if it is the same as the solution-wide `Platform`.
Otherwise the VS IDE skips building it.

Fixes: #27330
2025-10-24 10:18:01 -04:00
Brad King 4747b64fff VS: Restore include_external_msproject type detection
Refactoring in commit 3882718872 (VS: Decouple solution generation from
`.sln` file format, 2025-09-15) accidentally left out automatic
detection of the external project type id from its file extension.
2025-09-29 16:47:46 -04:00
Brad King e6aa7742b0 VS: Generate .slnx files for VS 2026
Since the `Visual Studio 18 2026` generator is new, we can switch
to the `.slnx` file format without changing behavior for users of
VS 2022 and older.

Fixes: #25887
2025-09-18 12:00:01 -04:00
Brad King 95c2034b32 Tests/RunCMake: Factor out sln-format check scripts 2025-09-18 12:00:00 -04:00
Brad King f4aa34daa7 Tests/RunCMake: Update cmake_minimum_required versions to 3.10
For policy-specific tests, use the version before the policy was
introduced.  Otherwise, use 3.10 where possible.
2024-10-03 11:52:22 -04:00
Brad King 71a4f052ed Tests: Avoid running VS 16+ tests when using a pre-v140 toolset 2024-05-13 10:57:27 -04:00
Brad King 03c31b0395 Drop Visual Studio 9 2008 generator
This generator has been deprecated since CMake 3.27.  Remove it.
2024-05-08 10:37:34 -04:00
Brad King 1edf138506 Tests/RunCMake: Update cmake_minimum_required versions
For policy-specific tests, use the version before the policy was
introduced.  Otherwise, use 3.5 where possible.

Also, remove `cmake_minimum_required()` and `project()` calls from
individual cases where they are handled by `CMakeLists.txt`.
2023-02-11 06:24:22 -05:00
Sumit Bhardwaj 7219988b00 VS: Exclude ZERO_CHECK.proj from .sln for include_external_msproject
In `cmGlobalVisualStudio7Generator::WriteTargetsToSolution`, we skip
writing `ZERO_CHECK.proj` to solution file as the check in
`cmGlobalVisualStudioGenerator::IsInSolution` returns `false` for
`ZERO_CHECK`. However, we write ZERO_CHECK to ProjectDependencies for
external projects as there are no checks in
`cmGlobalVisualStudio71Generator::WriteExternalProject`.

Similar to `cmGlobalVisualStudioGenerator::IsInSolution`, we introduce
`IsDepInSolution(const std::string&)` which excludes `ZERO_CHECK.proj`
from being added to sln file for the cases where we have `ZERO_CHECK.proj`.

Fixes: #23708
2022-07-20 08:51:38 -04:00
Dario Passet c7aa3bdefc Tests/include_external_msproject: Check C# project reference 2021-05-13 18:38:01 +02:00
Jean-Christophe Fillion-Robin 207373802e Fix typos identified using codespell
See https://github.com/codespell-project/codespell#readme

The following command was used:

```
codespell -q6 --skip="\
.git,\
*.json,\
./Copyright.txt,\
./Help/command/foreach.rst,\
./Help/prop_test/REQUIRED_FILES.rst,\
./Help/variable/CTEST_COVERAGE_COMMAND.rst,\
./Modules/CMakeCheckCompilerFlagCommonPatterns.cmake,\
./Modules/CMakeRCInformation.cmake,\
./Modules/Internal/CPack/NSIS.template.in,\
./Modules/FindMatlab.cmake,\
./Modules/MatlabTestsRedirect.cmake,\
./Modules/Platform/Windows-Clang.cmake,\
./Modules/Platform/Windows-Intel-Fortran.cmake,\
./Modules/Platform/Windows-MSVC.cmake,\
./Source/CMakeVersion.cmake,\
./Source/cmConvertMSBuildXMLToJSON.py,\
./Source/cmCreateTestSourceList.cxx,\
./Source/cmGlobalVisualStudio10Generator.cxx,\
./Source/cmExportBuildFileGenerator.cxx,\
./Source/cmExportInstallAndroidMKGenerator.cxx,\
./Source/cmExportInstallFileGenerator.cxx,\
./Source/cmExportSet.cxx,\
./Source/cmExportTryCompileFileGenerator.cxx,\
./Source/cmFindPackageCommand.cxx,\
./Source/cmInstallCommand.cxx,\
./Source/cmGeneratorExpressionLexer.cxx,\
./Source/cmLocalVisualStudio7Generator.cxx,\
./Source/cmOrderDirectories.cxx,\
./Source/cmTarget.cxx,\
./Source/kwsys/*,\
./Source/QtDialog/CMakeSetupDialog.ui,\
./Source/CPack/WiX/cmWIXRichTextFormatWriter.cxx,\
./Source/CTest/cmParseCoberturaCoverage.h,\
./Tests/CMakeTests/ImplicitLinkInfoTest.cmake.in,\
./Tests/RunCMake/CPack/tests/DMG_SLA/English.license.rtf,\
./Tests/RunCMake/CPack/tests/DMG_SLA/German.license.txt,\
./Tests/RunCMake/CPack/tests/DMG_SLA/German.menu.txt,\
./Tests/RunCMake/GoogleTest/xml_output.cpp,\
./Tests/RunCMake/Make/TargetMessages*,\
./Utilities/*,\
" \
-L "\
dependees,\
endwhile,\
fo,\
filetest,\
helpfull,\
nd,\
objext,\
stoll,\
supercedes,\
superceded,\
vas,\
varn,\
"
```
2020-07-22 12:44:47 -04:00
Brad King 9b99b4bfc8 Tests/RunCMake: Update cmake_minimum_required versions
Use 3.3 or 2.8.12 where possible.
2020-06-18 09:52:05 -04:00
Joerg Bornemann ae1e1909a1 VS: Add support for .NET Standard and .NET Core
Fixes: #20105
2020-01-24 09:11:05 -05:00
Brad King 57e48f16f2 VS: Add Visual Studio 16 2019 generator
Add this generator *without* support for specifying the target
architecture in the generator name.  cmake-gui will be taught
to provide a field for this, and command-line builds can use -A.

Also, teach this generator to select a default target architecture
based on the host architecture.

Fixes: #18689
Inspired-by: Egor Pugin <egor.pugin@gmail.com>
2019-01-11 11:04:51 -05:00
Beeble 227de0b95d include_external_msproject: Honor MAP_IMPORTED_CONFIG_<CONFIG>
This allows projects added via `include_external_msproject` to compile
the preferred configuration despite different naming conventions.
2017-04-05 13:44:03 -04:00
Daniel Pfeifer 7a649111cd Use string(APPEND) in Tests
Automate with:

find Tests -type f -print0 | xargs -0 perl -i -0pe \
's/set\(([a-zA-Z0-9_]+)(\s+)"\$\{\1\}([^"])/string(APPEND \1\2"\3/g'
2016-07-28 00:43:04 +02:00
Brad King 09ab207c66 Tests: Add generator platform support
Propagate CMAKE_GENERATOR_PLATFORM through the test hierarchy so that all
tests can build with the selected generator platform, if any.
2014-09-10 11:21:50 -04:00
Brad King d05a9bd1e6 Cygwin: Avoid legacy warnings in RunCMake.* tests
Set the minimum required version of CMake high enough to avoid the
warning for CMAKE_LEGACY_CYGWIN_WIN32.  The warning appears on stderr
and breaks the expected output matching.
2013-08-13 09:50:15 -04:00
Kitware Robot 9db3116226 Remove CMake-language block-end command arguments
Ancient versions of CMake required else(), endif(), and similar block
termination commands to have arguments matching the command starting the
block.  This is no longer the preferred style.

Run the following shell code:

for c in else endif endforeach endfunction endmacro endwhile; do
    echo 's/\b'"$c"'\(\s*\)(.\+)/'"$c"'\1()/'
done >convert.sed &&
git ls-files -z -- bootstrap '*.cmake' '*.cmake.in' '*CMakeLists.txt' |
egrep -z -v '^(Utilities/cm|Source/kwsys/)' |
egrep -z -v 'Tests/CMakeTests/While-Endwhile-' |
xargs -0 sed -i -f convert.sed &&
rm convert.sed
2012-08-13 14:19:16 -04:00
Brad King 4a30258d91 include_external_msproject: Test TYPE, GUID, PLATFORM options (#13120)
Add "RunCMake.include_external_msproject" test to use the TYPE, GUID, and
PLATFORM options to include_external_msproject.  Since projects with
custom types and platforms cannot be loaded without special VS plugins
validate the results by directly parsing the generated solution (.sln).

Co-Author: Leonid Yurchenko <nocturne@qarea.com>
2012-04-19 08:35:55 -04:00