Commit Graph
8 Commits
Author SHA1 Message Date
Nikita Nemkin c705279bae Help: Add .. versionadded directives to commands documentation
This change ony concerns directives that appear in the document body.

The guidelines for inserting version directives:

 * Baseline version is CMake 3.0, i.e. directives start at 3.1.
 * Always use `.. versionadded::` directive, avoid ad-hoc version
   references. Exception: policy pages.
 * For new command signatures, put `versionadded` on a separate line
   after the signature.
 * For a group of new signatures in a new document section,
   a single version note at the beginning of the section is sufficient.
 * For new options, put `versionadded` on a separate line before
   option description.
 * If all the option descriptions in the list are short one-liners,
   it's fine to put `versionadded` on the same line as the description.
 * If multiple option descriptions in close proximity would have
   the same ..versionadded directive, consider adding a single
   directive after the list, mentioning all added options.
 * For compact value lists and sub-option lists, put a single
  `versionadded` directive after the list mentioning all additions.
 * When a change is described in a single paragraph, put
   `versionadded` into that paragraph.
 * When only part of the paragraph has changed, separate the changed
   part if it doesn't break the flow. Otherwise, write a follow-up
   clarification paragraph and apply version directive to that.
 * When multiple version directives are close by, order earlier
   additions before later additions.
 * Indent related lists and code blocks to include them in the scope
   of `versionadded` directive.

Issue: #19715
2020-11-09 20:51:57 +05:00
Bartosz Kosiorek cb811d11ce Help: Improve description of modules 2019-04-23 10:39:34 +02:00
Bartosz Kosiorek 456e0fb64f Help: Improve documentation formating 2019-04-04 15:13:58 +02:00
Joachim Wuttke (o) adbaadf0ee Help: Apply syntax highlighting to project commands
* Replace most "::" by ".. code-block:: cmake"
  * Header sentence in imperative voice,
    detailed command description in present tense.
2018-10-25 13:47:31 +02:00
Beeble 227de0b95d include_external_msproject: Honor MAP_IMPORTED_CONFIG_<CONFIG>
This allows projects added via `include_external_msproject` to compile
the preferred configuration despite different naming conventions.
2017-04-05 13:44:03 -04:00
Brad King b42866a34a Drop Visual Studio 6 generator
This generator has been deprecated since CMake 3.3.  Remove it.
Update documentation, modules, and tests to drop content specific
to this generator.
2016-03-09 09:42:18 -05:00
Michael Scott c3f40f4fd9 Help: Improve formatting of command documentation
Use inline reStructuredText markup and add cross-references in more
places.
2015-06-08 16:28:31 -04:00
Kitware Robot f051814ed0 Convert builtin help to reStructuredText source files
Run the convert-help.bash script to convert documentation:

 ./convert-help.bash "/path/to/CMake-build/bin"

Then remove it.
2013-10-15 14:12:03 -04:00